1060 Vienna, 1070 Vienna, Mariahilfer Straße
Client: Magistrat der Stadt Wien – MA28
Construction period: 1 Year 2 Months
Construction description:
Conversion of Mariahilfer Straße into a shared space zone (concrete block paving) and a pedestrian zone (natural stone paving).
Narrowing of the carriageway
Widening of the pavements
Raising of the former carriageway area to pavement level






